Substation Scout

Piatt, IL interconnection queue

2 active projects totaling 471 MW in the MISO queue, plus 4 with terminal status (shown grayed).

2active projects
471active MW
6total filed
Queue IDProjectkVMWResourceStatus
IP12 Not reported n/r 500 Other Withdrawn
J1360 Not reported 345 300 Wind Active
J1021 Not reported 345 200 Wind Withdrawn
J3382 Not reported 138 171 Solar Active
J1118 Not reported 138 150 Wind Withdrawn
J158 Not reported 138 150 Wind Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first