MISO request J3357
MISO queue ID J3357
Queue request J3357 was listed in the MISO interconnection queue at the end of 2025 as a 200 MW battery project in Kosciusko County, IN, according to Berkeley Lab’s queue data file. The filing names LEESBURG as its point of interconnection. Its status as of December 31, 2025 was “Active”, with a proposed online date of December 31, 2028.
| Queue ID | J3357 |
|---|---|
| Project name | Not reported |
| Status (as published) | Active |
| Substation | LEESBURG |
| Point of interconnection | LEESBURG |
| County | Kosciusko |
| State | IN |
| Voltage | Not reported |
| Capacity | 200 MW |
| Resource (as published) | Battery |
| Resource category | Battery (normalized for filtering) |
| Proposed online date | 2028-12-31 |
| Source dataset | Berkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025 |
Same substation and county
Kosciusko, IN: 5 requests in the MISO queue, 1 active totaling 200 MW.
Tracked changes
Not tracked. MISO rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.
Additional filed fields
| Utility | NORTHERN INDIANA PUBLIC SERVICE COMPANY |
|---|---|
| Cluster | DPP-2023 Central |
| Interconnection service | NRIS |
| Project type | Generation |
| Study phase (standardized by Berkeley Lab) | In Progress (unknown study) |
| Study phase (as the queue printed it) | Study Phase: DPP 1 |
| Queue date | 2024-04-15 |
Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.
Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.