Substation Scout

Kosciusko, IN interconnection queue

1 active project totaling 200 MW in the MISO queue, plus 4 with terminal status (shown grayed).

1active projects
200active MW
5total filed
Queue IDProjectkVMWResourceStatus
J2443 Not reported 345 500 Battery Withdrawn
J3499 Not reported 345 300 Solar Withdrawn
J3357 Not reported n/r 200 Battery Active
J2512 Not reported 345 173 Solar Withdrawn
J1112 Not reported 138 150 Solar Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.