MISO request J3254

MISO queue ID J3254

Queue request J3254 was listed in the MISO interconnection queue at the end of 2025 as a 175 MW hybrid project in Pulaski County, IL, according to Berkeley Lab’s queue data file. The filing names 5CAPE GIR3 - 5JOPPA SR as its point of interconnection. Its status as of December 31, 2025 was “Active”, with a proposed online date of December 30, 2026.

Queue IDJ3254
Project nameNot reported
Status (as published)Active
Substation5CAPE GIR3 - 5JOPPA SR
Point of interconnection5CAPE GIR3 - 5JOPPA SR 161.0kV
CountyPulaski
StateIL
Voltage161 kV
Capacity175 MW
Resource (as published)Solar+Battery
Resource categoryHybrid (normalized for filtering)
Proposed online date2026-12-30
Source datasetBerkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025

Same substation and county

Pulaski, IL: 9 requests in the MISO queue, 4 active totaling 775 MW.

Tracked changes

Not tracked. MISO rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.

Additional filed fields

UtilityAMEREN TRANSMISSION COMPANY OF ILLINOIS
ClusterDPP-2023 Central
Interconnection serviceNRIS
Project typeGeneration
Study phase (standardized by Berkeley Lab)In Progress (unknown study)
Study phase (as the queue printed it)Study Phase: DPP 1
Queue date2024-04-15
Components (hybrid)Solar 175 MW + Battery

Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.

Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first