Pulaski, IL interconnection queue

4 active projects totaling 775 MW in the MISO queue, plus 5 with terminal status (shown grayed).

4active projects
775active MW
9total filed
Queue IDProjectkVMWResourceStatus
J1830 Not reported 345 200 Hybrid Withdrawn
J3080 Not reported 345 200 Hybrid Active
J3276 Not reported n/r 200 Solar Withdrawn
J3497 Not reported n/r 200 Battery Active
J4137 Not reported n/r 200 Battery Active
J3254 Not reported 161 175 Hybrid Active
J1418 Not reported 161 100 Solar Withdrawn
J1799 Not reported 345 100 Solar Withdrawn
J920 Not reported 161 100 Solar Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.