MISO request J3229
MISO queue ID J3229
Queue request J3229 was listed in the MISO interconnection queue at the end of 2025 as a 140 MW hybrid project in Maries County, MO, according to Berkeley Lab’s queue data file. The filing names 4DILLON - 4LKSIDE TP2 as its point of interconnection. Its status as of December 31, 2025 was “Active”, with a proposed online date of April 24, 2026.
| Queue ID | J3229 |
|---|---|
| Project name | Not reported |
| Status (as published) | Active |
| Substation | 4DILLON - 4LKSIDE TP2 |
| Point of interconnection | 4DILLON - 4LKSIDE TP2 138.0kV |
| County | Maries |
| State | MO |
| Voltage | 138 kV |
| Capacity | 140 MW |
| Resource (as published) | Solar+Battery |
| Resource category | Hybrid (normalized for filtering) |
| Proposed online date | 2026-04-24 |
| Source dataset | Berkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025 |
Same substation and county
Maries, MO: 3 requests in the MISO queue, 2 active totaling 340 MW.
Tracked changes
Not tracked. MISO rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.
Additional filed fields
| Utility | AMEREN MISSOURI |
|---|---|
| Cluster | DPP-2022 Central |
| Interconnection service | NRIS |
| Project type | Generation |
| Study phase (standardized by Berkeley Lab) | Cluster Study |
| Study phase (as the queue printed it) | Study Phase: DPP 2; Post GIA Status: Not Started |
| Queue date | 2022-09-14 |
| Components (hybrid) | Solar 140 MW + Battery |
Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.
Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.