Substation Scout

Maries, MO interconnection queue

2 active projects totaling 340 MW in the MISO queue, plus 1 with terminal status (shown grayed).

2active projects
340active MW
3total filed
Queue IDProjectkVMWResourceStatus
J1681 Not reported 345 200 Solar Withdrawn
J2238 Not reported 345 200 Hybrid Active
J3229 Not reported 138 140 Hybrid Active

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.