MISO queue ID J3155

Queue request J3155 was listed in the MISO interconnection queue at the end of 2025 as a 150 MW gas project in Winnebago County, WI, according to Berkeley Lab’s queue data file. The filing names Neevin as its point of interconnection. Its status as of December 31, 2025 was “Active”, with a proposed online date of September 1, 2025.

Queue IDJ3155
Project nameNot reported
Status (as published)Active
SubstationNeevin
Point of interconnectionNeevin
CountyWinnebago
StateWI
VoltageNot reported
Capacity150 MW
Resource (as published)Gas
Resource categoryGas (normalized for filtering)
Proposed online date2025-09-01
Source datasetBerkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025

Same substation and county

Winnebago, WI: 7 requests in the MISO queue, 4 active totaling 804.8 MW.

Tracked changes

Not tracked. MISO rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.

Additional filed fields

UtilityAMERICAN TRANSMISSION COMPANY
ClusterDPP-2022 East (ATC)
Interconnection serviceNRIS
Project typeGeneration
Study phase (standardized by Berkeley Lab)Cluster Study
Study phase (as the queue printed it)Study Phase: DPP 2; Post GIA Status: Not Started
Queue date2022-09-15

Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.

Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first