Winnebago, WI interconnection queue
4 active projects totaling 804.8 MW in the MISO queue, plus 3 with terminal status (shown grayed).
4active projects
804.8active MW
7total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| J338 | Not reported | 345 | 845 | Gas | Withdrawn |
| J337 | Not reported | 345 | 551 | Gas | Withdrawn |
| G100 | Not reported | n/r | 530 | Other | Withdrawn |
| E0038 | Not reported | 138 | 454.8 | Gas | Active |
| J3155 | Not reported | n/r | 150 | Gas | Active |
| J1745 | Not reported | 138 | 100 | Solar | Active |
| J3466 | Not reported | n/r | 100 | Solar | Active |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.