Substation Scout

MISO request J3133

MISO queue ID J3133

Queue request J3133 was listed in the MISO interconnection queue at the end of 2025 as a 120 MW battery project in Saginaw County, MI, according to Berkeley Lab’s queue data file. The filing names Murphy to Nelson Road as its point of interconnection. Its status as of December 31, 2025 was “Active”, with a proposed online date of August 31, 2026.

Queue IDJ3133
Project nameNot reported
Status (as published)Active
SubstationMurphy to Nelson Road
Point of interconnectionMurphy to Nelson Road 345 kV
CountySaginaw
StateMI
Voltage345 kV
Capacity120 MW
Resource (as published)Battery
Resource categoryBattery (normalized for filtering)
Proposed online date2026-08-31
Source datasetBerkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025

Same substation and county

Saginaw, MI: 21 requests in the MISO queue, 12 active totaling 2,045.3 MW.

Tracked changes

Not tracked. MISO rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.

Additional filed fields

UtilityWOLVERINE POWER SUPPLY COOPERATIVE
ClusterDPP-2022 East (ITC)
Interconnection serviceNRIS
Project typeGeneration
Study phase (standardized by Berkeley Lab)Cluster Study
Study phase (as the queue printed it)Study Phase: DPP 2; Post GIA Status: Not Started
Queue date2022-09-14

Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.

Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first