MISO request J3047

MISO queue ID J3047

Queue request J3047 was listed in the MISO interconnection queue at the end of 2025 as a 263 MW gas project in Adair County, IA, according to Berkeley Lab’s queue data file. The filing names ORIENT - NORTHBORO as its point of interconnection. Its status as of December 31, 2025 was “Active”, with a proposed online date of September 1, 2027.

Queue IDJ3047
Project nameNot reported
Status (as published)Active
SubstationORIENT - NORTHBORO
Point of interconnectionORIENT - NORTHBORO 345.0kV
CountyAdair
StateIA
Voltage345 kV
Capacity263 MW
Resource (as published)Gas
Resource categoryGas (normalized for filtering)
Proposed online date2027-09-01
Source datasetBerkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025

Same substation and county

ORIENT - NORTHBORO substation: 2 requests in the MISO queue, 2 active totaling 663 MW.

Queue IDProjectMWResourceStatus
J3701Not reported400WindActive

Adair, IA: 15 requests in the MISO queue, 8 active totaling 2,181 MW.

Tracked changes

Not tracked. MISO rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.

Additional filed fields

UtilityMIDAMERICAN ENERGY CO.
ClusterDPP-2022 West
Interconnection serviceNRIS
Project typeGeneration
Study phase (standardized by Berkeley Lab)Cluster Study
Study phase (as the queue printed it)Study Phase: DPP 2; Post GIA Status: Not Started
Queue date2022-09-15

Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.

Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.