MISO request J3040
MISO queue ID J3040
Queue request J3040 was listed in the MISO interconnection queue at the end of 2025 as a 365 MW solar project in Ouachita County, AR, according to Berkeley Lab’s queue data file. The filing names EL DORADO EHV - MCNEIL EHV as its point of interconnection. Its status as of December 31, 2025 was “Active”, with a proposed online date of October 31, 2027.
| Queue ID | J3040 |
|---|---|
| Project name | Not reported |
| Status (as published) | Active |
| Substation | EL DORADO EHV - MCNEIL EHV |
| Point of interconnection | EL DORADO EHV - MCNEIL EHV 500.0kV |
| County | Ouachita |
| State | AR |
| Voltage | 500 kV |
| Capacity | 365 MW |
| Resource (as published) | Solar |
| Resource category | Solar (normalized for filtering) |
| Proposed online date | 2027-10-31 |
| Source dataset | Berkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025 |
Same substation and county
Ouachita, AR: 7 requests in the MISO queue, 5 active totaling 1,175.8 MW.
Tracked changes
Not tracked. MISO rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.
Additional filed fields
| Utility | ENTERGY ARKANSAS |
|---|---|
| Cluster | DPP-2022 South |
| Interconnection service | NRIS |
| Project type | Generation |
| Study phase (standardized by Berkeley Lab) | Cluster Study |
| Study phase (as the queue printed it) | Study Phase: DPP 2; Post GIA Status: Not Started |
| Queue date | 2022-09-13 |
Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.
Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.