MISO request J3002
MISO queue ID J3002
Queue request J3002 was listed in the MISO interconnection queue at the end of 2025 as a 288 MW hybrid project in Pine County, MN, according to Berkeley Lab’s queue data file. The filing names Arrowhead - Bear Creek (GRE) as its point of interconnection. Its status as of December 31, 2025 was “Active”, with a proposed online date of August 30, 2025.
| Queue ID | J3002 |
|---|---|
| Project name | Not reported |
| Status (as published) | Active |
| Substation | Arrowhead - Bear Creek (GRE) |
| Point of interconnection | Arrowhead - Bear Creek (GRE) 230kV |
| County | Pine |
| State | MN |
| Voltage | 230 kV |
| Capacity | 288 MW |
| Resource (as published) | Solar+Battery |
| Resource category | Hybrid (normalized for filtering) |
| Proposed online date | 2025-08-30 |
| Source dataset | Berkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025 |
Same substation and county
Pine, MN: 2 requests in the MISO queue, 2 active totaling 438 MW.
Tracked changes
Not tracked. MISO rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.
Additional filed fields
| Utility | MINNESOTA POWER INC. |
|---|---|
| Cluster | DPP-2022 West |
| Interconnection service | NRIS |
| Project type | Generation |
| Study phase (standardized by Berkeley Lab) | Cluster Study |
| Study phase (as the queue printed it) | Study Phase: DPP 2; Post GIA Status: Not Started |
| Queue date | 2022-09-15 |
| Components (hybrid) | Solar 288 MW + Battery |
Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.
Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.