Pine, MN interconnection queue
2 active projects totaling 438 MW in the MISO queue.
2active projects
438active MW
2total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| J3002 | Not reported | 230 | 288 | Hybrid | Active |
| J3850 | Not reported | n/r | 150 | Solar | Active |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.
Site Scanner