MISO request J2990
MISO queue ID J2990
Queue request J2990 was listed in the MISO interconnection queue at the end of 2025 as a 200 MW wind project in Pottawattamie County, IA, according to Berkeley Lab’s queue data file. The filing names Overland - J1859 POI Line Tap as its point of interconnection. Its status as of December 31, 2025 was “Active”, with a proposed online date of June 15, 2025.
| Queue ID | J2990 |
|---|---|
| Project name | Not reported |
| Status (as published) | Active |
| Substation | Overland - J1859 POI Line Tap |
| Point of interconnection | Overland - J1859 POI 345kV Line Tap |
| County | Pottawattamie |
| State | IA |
| Voltage | 345 kV |
| Capacity | 200 MW |
| Resource (as published) | Wind |
| Resource category | Wind (normalized for filtering) |
| Proposed online date | 2025-06-15 |
| Source dataset | Berkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025 |
Same substation and county
Pottawattamie, IA: 12 requests in the MISO queue, 1 active totaling 200 MW.
Tracked changes
Not tracked. MISO rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.
Additional filed fields
| Utility | MIDAMERICAN ENERGY CO. |
|---|---|
| Cluster | DPP-2022 West |
| Interconnection service | NRIS |
| Project type | Generation |
| Study phase (standardized by Berkeley Lab) | Cluster Study |
| Study phase (as the queue printed it) | Study Phase: DPP 2; Post GIA Status: Not Started |
| Queue date | 2022-09-14 |
Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.
Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.