Substation Scout

Pottawattamie, IA interconnection queue

1 active project totaling 200 MW in the MISO queue, plus 11 with terminal status (shown grayed).

1active projects
200active MW
12total filed
Queue IDProjectkVMWResourceStatus
J363 Not reported 345 810 Gas Withdrawn
J365 Not reported 345 464 Gas Withdrawn
J2410 Not reported 345 300 Wind Withdrawn
J3018 Not reported 345 300 Battery Withdrawn
J3766 Not reported 345 235 Wind Withdrawn
J366 Not reported 161 232 Gas Withdrawn
J1122 Not reported 345 200 Wind Withdrawn
J1859 Not reported 345 200 Wind Withdrawn
J2990 Not reported 345 200 Wind Active
J361 Not reported 69 116 Gas Withdrawn
J536 Not reported n/r 100 Solar Withdrawn
R58 Not reported 161 3 Wind Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first