Queue request J2974 was listed in the MISO interconnection queue at the end of 2025 as a 50 MW battery project in Adams County, IL, according to Berkeley Lab’s queue data file. The filing names 4HULL - 4HERLEMAN as its point of interconnection. Its status as of December 31, 2025 was “Active”, with a proposed online date of August 15, 2026.

Queue IDJ2974
Project nameNot reported
Status (as published)Active
Substation4HULL - 4HERLEMAN
Point of interconnection4HULL - 4HERLEMAN 138.0kV
CountyAdams
StateIL
Voltage138 kV
Capacity50 MW
Resource (as published)Battery
Resource categoryBattery (normalized for filtering)
Proposed online date2026-08-15
Source datasetBerkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025

Same substation and county

4HULL - 4HERLEMAN substation: 2 requests in the MISO queue, 2 active totaling 190 MW.

Queue IDProjectMWResourceStatus
J2972Not reported140SolarActive

Adams, IL: 10 requests in the MISO queue, 6 active totaling 815 MW.

Tracked changes

Not tracked. MISO rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.

Additional filed fields

UtilityAMEREN ILLINOIS
ClusterDPP-2022 Central
Interconnection serviceNRIS
Project typeGeneration
Study phase (standardized by Berkeley Lab)Cluster Study
Study phase (as the queue printed it)Study Phase: DPP 2; Post GIA Status: Not Started
Queue date2022-09-15

Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.

Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.