Adams, IL interconnection queue
6 active projects totaling 815 MW in the MISO queue, plus 4 with terminal status (shown grayed).
6active projects
815active MW
10total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| H079 | Not reported | 138 | 200 | Wind | Withdrawn |
| J2258 | Not reported | 138 | 175 | Solar | Active |
| J2203 | Not reported | n/r | 150 | Battery | Active |
| J2389 | Not reported | n/r | 150 | Hybrid | Active |
| J2627 | Not reported | n/r | 150 | Battery | Active |
| J751 | Not reported | n/r | 150 | Wind | Withdrawn |
| G598 | Not reported | 120 | 144 | Wind | Withdrawn |
| G599 | Not reported | 120 | 144 | Wind | Withdrawn |
| J2972 | Not reported | 138 | 140 | Solar | Active |
| J2974 | Not reported | 138 | 50 | Battery | Active |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.