MISO request J2952
MISO queue ID J2952
Queue request J2952 was listed in the MISO interconnection queue at the end of 2025 as a 100 MW solar project in Chambers County, TX, according to Berkeley Lab’s queue data file. The filing names Crooked Bayou to Stowell Line as its point of interconnection. Its status as of December 31, 2025 was “Active”, with a proposed online date of September 30, 2026.
| Queue ID | J2952 |
|---|---|
| Project name | Not reported |
| Status (as published) | Active |
| Substation | Crooked Bayou to Stowell Line |
| Point of interconnection | Crooked Bayou to Stowell 138 kV Line |
| County | Chambers |
| State | TX |
| Voltage | 138 kV |
| Capacity | 100 MW |
| Resource (as published) | Solar |
| Resource category | Solar (normalized for filtering) |
| Proposed online date | 2026-09-30 |
| Source dataset | Berkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025 |
Same substation and county
Chambers, TX: 3 requests in the MISO queue, 1 active totaling 100 MW.
Tracked changes
Not tracked. MISO rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.
Additional filed fields
| Utility | ENTERGY TEXAS, INC. |
|---|---|
| Cluster | DPP-2022 South |
| Interconnection service | NRIS |
| Project type | Generation |
| Study phase (standardized by Berkeley Lab) | Cluster Study |
| Study phase (as the queue printed it) | Study Phase: DPP 2; Post GIA Status: Not Started |
| Queue date | 2022-09-14 |
Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.