MISO request J2938

MISO queue ID J2938

Queue request J2938 was listed in the MISO interconnection queue at the end of 2025 as a 200 MW wind project in Knox County, IL, according to Berkeley Lab’s queue data file. The filing names 4MONM BLVD W - 4CASTRO_JCT as its point of interconnection. Its status as of December 31, 2025 was “Active”, with a proposed online date of June 30, 2025.

Queue IDJ2938
Project nameNot reported
Status (as published)Active
Substation4MONM BLVD W - 4CASTRO_JCT
Point of interconnection4MONM BLVD W - 4CASTRO_JCT 138.0kV
CountyKnox
StateIL
Voltage138 kV
Capacity200 MW
Resource (as published)Wind
Resource categoryWind (normalized for filtering)
Proposed online date2025-06-30
Source datasetBerkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025

Same substation and county

4MONM BLVD W - 4CASTRO_JCT substation: 2 requests in the MISO queue, 1 active totaling 200 MW.

Queue IDProjectMWResourceStatus
J3343Not reported100SolarWithdrawn

Knox, IL: 9 requests in the MISO queue, 4 active totaling 900 MW.

Tracked changes

Not tracked. MISO rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.

Additional filed fields

UtilityAMEREN ILLINOIS
ClusterDPP-2022 Central
Interconnection serviceNRIS
Project typeGeneration
Study phase (standardized by Berkeley Lab)Cluster Study
Study phase (as the queue printed it)Study Phase: DPP 2; Post GIA Status: Not Started
Queue date2022-09-15

Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.

Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first