Knox, IL interconnection queue

4 active projects totaling 900 MW in the MISO queue, plus 5 with terminal status (shown grayed).

4active projects
900active MW
9total filed
Queue IDProjectkVMWResourceStatus
J3498 Not reported 345 300 Solar Active
J844 Not reported 138 300 Wind Active
J2938 Not reported 138 200 Wind Active
J3323 Not reported n/r 200 Solar Withdrawn
J008 Not reported n/r 150 Wind Withdrawn
J3343 Not reported 138 100 Solar Withdrawn
J3344 Not reported 345 100 Battery Active
J887 Not reported 138 75 Wind Withdrawn
G694 Not reported 138 62 Wind Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.