MISO request J2931

MISO queue ID J2931

Queue request J2931 was listed in the MISO interconnection queue at the end of 2025 as a 400 MW solar project in Henderson County, KY, according to Berkeley Lab’s queue data file. The filing names AB Brown 345 - Reid EHV (BREC Terminal) as its point of interconnection. Its status as of December 31, 2025 was “Active”, with a proposed online date of October 1, 2025.

Queue IDJ2931
Project nameNot reported
Status (as published)Active
SubstationAB Brown 345 - Reid EHV (BREC Terminal)
Point of interconnectionAB Brown 345 - Reid EHV (BREC Terminal) 345.0kV
CountyHenderson
StateKY
Voltage345 kV
Capacity400 MW
Resource (as published)Solar
Resource categorySolar (normalized for filtering)
Proposed online date2025-10-01
Source datasetBerkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025

Same substation and county

AB Brown 345 - Reid EHV (BREC Terminal) substation: 4 requests in the MISO queue, 3 active totaling 800 MW.

Queue IDProjectMWResourceStatus
J2844Not reported200BatteryActive
J2930Not reported200WindActive
J3779Not reported100WindWithdrawn

Henderson, KY: 23 requests in the MISO queue, 6 active totaling 1,250 MW.

Tracked changes

Not tracked. MISO rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.

Additional filed fields

UtilitySouthern Indiana Gas & Electric Company d/b/a Centerpoint Energy Indiana South
ClusterDPP-2022 Central
Interconnection serviceNRIS
Project typeGeneration
Study phase (standardized by Berkeley Lab)Cluster Study
Study phase (as the queue printed it)Study Phase: DPP 2; Post GIA Status: Not Started
Queue date2022-09-14

Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.

Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.