MISO request J2753

MISO queue ID J2753

Queue request J2753 was listed in the MISO interconnection queue at the end of 2025 as a 200 MW solar project in East Carroll Parish, LA, according to Berkeley Lab’s queue data file. The filing names DARNELL - TALLULAH as its point of interconnection. Its status as of December 31, 2025 was “Active”, with a proposed online date of January 1, 2026.

Queue IDJ2753
Project nameNot reported
Status (as published)Active
SubstationDARNELL - TALLULAH
Point of interconnectionDARNELL - TALLULAH 115.0kV
CountyEast Carroll Parish
StateLA
Voltage115 kV
Capacity200 MW
Resource (as published)Solar
Resource categorySolar (normalized for filtering)
Proposed online date2026-01-01
Source datasetBerkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025

Same substation and county

East Carroll Parish, LA: 3 requests in the MISO queue, 1 active totaling 200 MW.

Tracked changes

Not tracked. MISO rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.

Additional filed fields

UtilityENTERGY LOUISIANA
ClusterDPP-2022 South
Interconnection serviceERIS
Project typeGeneration
Study phase (standardized by Berkeley Lab)Cluster Study
Study phase (as the queue printed it)Study Phase: DPP 2; Post GIA Status: Not Started
Queue date2025-08-21

Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.

Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.