Substation Scout

East Carroll Parish, LA interconnection queue

1 active project totaling 200 MW in the MISO queue, plus 2 with terminal status (shown grayed).

1active projects
200active MW
3total filed
Queue IDProjectkVMWResourceStatus
J2753 Not reported 115 200 Solar Active
J2832 Not reported 115 110 Hybrid Withdrawn
J2699 Not reported 115 58.1 Solar Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.