MISO request J2738

MISO queue ID J2738

Queue request J2738 was listed in the MISO interconnection queue at the end of 2025 as a 128 MW hybrid project in Rock Island County, IL, according to Berkeley Lab’s queue data file. The filing names SUB 17 as its point of interconnection. Its status as of December 31, 2025 was “Active”, with a proposed online date of February 1, 2025.

Queue IDJ2738
Project nameNot reported
Status (as published)Active
SubstationSUB 17
Point of interconnectionSUB 17
CountyRock Island
StateIL
VoltageNot reported
Capacity128 MW
Resource (as published)Solar+Battery
Resource categoryHybrid (normalized for filtering)
Proposed online date2025-02-01
Source datasetBerkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025

Same substation and county

Rock Island, IL: 7 requests in the MISO queue, 5 active totaling 1,008 MW.

Tracked changes

Not tracked. MISO rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.

Additional filed fields

UtilityMIDAMERICAN ENERGY CO.
ClusterDPP-2022 West
Interconnection serviceNRIS
Project typeGeneration
Study phase (standardized by Berkeley Lab)Cluster Study
Study phase (as the queue printed it)Study Phase: DPP 2; Post GIA Status: Not Started
Queue date2022-09-15
Components (hybrid)Solar 128 MW + Battery

Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.

Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.