Queue request J2738 was listed in the MISO interconnection queue at the end of 2025 as a 128 MW hybrid project in Rock Island County, IL, according to Berkeley Lab’s queue data file. The filing names SUB 17 as its point of interconnection. Its status as of December 31, 2025 was “Active”, with a proposed online date of February 1, 2025.
| Queue ID | J2738 |
|---|---|
| Project name | Not reported |
| Status (as published) | Active |
| Substation | SUB 17 |
| Point of interconnection | SUB 17 |
| County | Rock Island |
| State | IL |
| Voltage | Not reported |
| Capacity | 128 MW |
| Resource (as published) | Solar+Battery |
| Resource category | Hybrid (normalized for filtering) |
| Proposed online date | 2025-02-01 |
| Source dataset | Berkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025 |
Same substation and county
Rock Island, IL: 7 requests in the MISO queue, 5 active totaling 1,008 MW.
Tracked changes
Not tracked. MISO rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.
Additional filed fields
| Utility | MIDAMERICAN ENERGY CO. |
|---|---|
| Cluster | DPP-2022 West |
| Interconnection service | NRIS |
| Project type | Generation |
| Study phase (standardized by Berkeley Lab) | Cluster Study |
| Study phase (as the queue printed it) | Study Phase: DPP 2; Post GIA Status: Not Started |
| Queue date | 2022-09-15 |
| Components (hybrid) | Solar 128 MW + Battery |