Substation Scout

MISO request J2720

MISO queue ID J2720

Queue request J2720 was listed in the MISO interconnection queue at the end of 2025 as a 150 MW solar project in Yazoo County, MS, according to Berkeley Lab’s queue data file. The filing names MIDWAY SS (CE) - YAZOO CITY SS as its point of interconnection. Its status as of December 31, 2025 was “Active”, with a proposed online date of April 25, 2025.

Queue IDJ2720
Project nameNot reported
Status (as published)Active
SubstationMIDWAY SS (CE) - YAZOO CITY SS
Point of interconnectionMIDWAY SS (CE) - YAZOO CITY SS 115.0kV
CountyYazoo
StateMS
Voltage115 kV
Capacity150 MW
Resource (as published)Solar
Resource categorySolar (normalized for filtering)
Proposed online date2025-04-25
Source datasetBerkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025

Same substation and county

Yazoo, MS: 2 requests in the MISO queue, 1 active totaling 150 MW.

Tracked changes

Not tracked. MISO rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.

Additional filed fields

UtilityENTERGY MISSISSIPPI, LLC.
ClusterDPP-2022 South
Interconnection serviceNRIS
Project typeGeneration
Study phase (standardized by Berkeley Lab)Cluster Study
Study phase (as the queue printed it)Study Phase: DPP 2; Post GIA Status: Not Started
Queue date2022-09-14

Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.

Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.