Yazoo, MS interconnection queue

1 active project totaling 150 MW in the MISO queue, plus 1 with terminal status (shown grayed).

1active projects
150active MW
2total filed
Queue IDProjectkVMWResourceStatus
J2720 Not reported 115 150 Solar Active
J2824 Not reported 115 70 Hybrid Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.