MISO queue ID J2639

Queue request J2639 was listed in the MISO interconnection queue at the end of 2025 as a 105.8 MW solar project in Bradley County, AR, according to Berkeley Lab’s queue data file. The filing names AECC HERMITAGE SOUTH - HILO as its point of interconnection. Its status as of December 31, 2025 was “Active”, with a proposed online date of June 1, 2025.

Queue IDJ2639
Project nameNot reported
Status (as published)Active
SubstationAECC HERMITAGE SOUTH - HILO
Point of interconnectionAECC HERMITAGE SOUTH - HILO 115.0kV
CountyBradley
StateAR
Voltage115 kV
Capacity105.8 MW
Resource (as published)Solar
Resource categorySolar (normalized for filtering)
Proposed online date2025-06-01
Source datasetBerkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025

Same substation and county

Bradley, AR: 6 requests in the MISO queue, 1 active totaling 105.8 MW.

Tracked changes

Not tracked. MISO rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.

Additional filed fields

UtilityENTERGY ARKANSAS
ClusterDPP-2022 South
Interconnection serviceNRIS
Project typeGeneration
Study phase (standardized by Berkeley Lab)Cluster Study
Study phase (as the queue printed it)Study Phase: DPP 2; Post GIA Status: Not Started
Queue date2022-09-09

Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.

Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.