Substation Scout

Bradley, AR interconnection queue

1 active project totaling 105.8 MW in the MISO queue, plus 5 with terminal status (shown grayed).

1active projects
105.8active MW
6total filed
Queue IDProjectkVMWResourceStatus
J2862 Not reported 115 150 Solar Withdrawn
J2977 Not reported 115 150 Solar Withdrawn
J858 Not reported 115 140 Solar Withdrawn
J2639 Not reported 115 105.8 Solar Active
J661 Not reported n/r 90 Solar Withdrawn
J377 Not reported 115 40 Solar Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first