MISO queue ID J2571

Queue request J2571 was listed in the MISO interconnection queue at the end of 2025 as a 176.6 MW wind project in Tunica County, MS, according to Berkeley Lab’s queue data file. The filing names J866 Six Mile Lake Substation as its point of interconnection. Its status as of December 31, 2025 was “Active”, with a proposed online date of January 31, 2024.

Queue IDJ2571
Project nameNot reported
Status (as published)Active
SubstationJ866 Six Mile Lake Substation
Point of interconnectionJ866 Six Mile Lake Substation
CountyTunica
StateMS
VoltageNot reported
Capacity176.6 MW
Resource (as published)Wind
Resource categoryWind (normalized for filtering)
Proposed online date2024-01-31
Source datasetBerkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025

Same substation and county

Tunica, MS: 13 requests in the MISO queue, 4 active totaling 696.6 MW.

Tracked changes

Not tracked. MISO rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.

Additional filed fields

UtilityENTERGY MISSISSIPPI, LLC.
ClusterDPP-2022 South
Interconnection serviceNRIS
Project typeGeneration
Study phase (standardized by Berkeley Lab)Cluster Study
Study phase (as the queue printed it)Study Phase: DPP 2; Post GIA Status: Not Started
Queue date2022-09-15

Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.

Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.