Substation Scout

MISO request J2509

MISO queue ID J2509

Queue request J2509 was listed in the MISO interconnection queue at the end of 2025 as a 200 MW wind project in Tippecanoe County, IN, according to Berkeley Lab’s queue data file. The filing names Westwood as its point of interconnection. Its status as of December 31, 2025 was “Active”, with a proposed online date of October 31, 2025.

Queue IDJ2509
Project nameNot reported
Status (as published)Active
SubstationWestwood
Point of interconnectionWestwood 345 kV
CountyTippecanoe
StateIN
Voltage345 kV
Capacity200 MW
Resource (as published)Wind
Resource categoryWind (normalized for filtering)
Proposed online date2025-10-31
Source datasetBerkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025

Same substation and county

Tippecanoe, IN: 6 requests in the MISO queue, 2 active totaling 300 MW.

Tracked changes

Not tracked. MISO rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.

Additional filed fields

UtilityDUKE ENERGY INDIANA
ClusterDPP-2022 Central
Interconnection serviceNRIS
Project typeGeneration
Study phase (standardized by Berkeley Lab)Cluster Study
Study phase (as the queue printed it)Study Phase: DPP 2; Post GIA Status: Not Started
Queue date2022-09-15

Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.

Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first