Tippecanoe, IN interconnection queue

2 active projects totaling 300 MW in the MISO queue, plus 4 with terminal status (shown grayed).

2active projects
300active MW
6total filed
Queue IDProjectkVMWResourceStatus
J028 Not reported 230 200 Wind Withdrawn
J2509 Not reported 345 200 Wind Active
J2060 Not reported 138 170 Solar Withdrawn
H026 Not reported 230 150 Wind Withdrawn
J163 Not reported 138 100 Wind Withdrawn
J2450 Not reported 345 100 Battery Active

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.