MISO request J246

MISO queue ID J246

Queue request J246 was listed in the MISO interconnection queue at the end of 2025 as a 7 MW wind project in Gratiot County, MI, according to Berkeley Lab’s queue data file. The filing names Nelson Road - Goss as its point of interconnection. Its status as of December 31, 2025 was “Operational”, with a proposed online date of June 1, 2015.

Queue IDJ246
Project nameNot reported
Status (as published)Operational
SubstationNelson Road - Goss
Point of interconnectionNelson Road - Goss 345 kV
CountyGratiot
StateMI
Voltage345 kV
Capacity7 MW
Resource (as published)Wind
Resource categoryWind (normalized for filtering)
Proposed online date2015-06-01
Source datasetBerkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025

Same substation and county

Nelson Road - Goss substation: 2 requests in the MISO queue, 1 active totaling 7 MW.

Queue IDProjectMWResourceStatus
J445Not reported2BatteryWithdrawn

Gratiot, MI: 25 requests in the MISO queue, 14 active totaling 1,723.3 MW.

Tracked changes

Not tracked. MISO rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.

Additional filed fields

ClusterDPP-2014-FEB East (ITC)
Project typeGeneration
Study phase (standardized by Berkeley Lab)IA Executed
Study phase (as the queue printed it)DPP - SIS
Queue date2012-05-21
Interconnection agreement date2014-09-22
Operational date2015-06-01

Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.

Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.