MISO request J2249

MISO queue ID J2249

Queue request J2249 was listed in the MISO interconnection queue at the end of 2025 as a 144 MW solar project in Acadia Parish, LA, according to Berkeley Lab’s queue data file. The filing names Bayou Cove as its point of interconnection. Its status as of December 31, 2025 was “Active”, with a proposed online date of November 14, 2027.

Queue IDJ2249
Project nameNot reported
Status (as published)Active
SubstationBayou Cove
Point of interconnectionBayou Cove
CountyAcadia Parish
StateLA
VoltageNot reported
Capacity144 MW
Resource (as published)Solar
Resource categorySolar (normalized for filtering)
Proposed online date2027-11-14
Source datasetBerkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025

Same substation and county

Acadia Parish, LA: 19 requests in the MISO queue, 6 active totaling 689 MW.

Tracked changes

Not tracked. MISO rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.

Additional filed fields

UtilityENTERGY LOUISIANA
ClusterDPP-2021 South
Interconnection serviceNRIS
Project typeGeneration
Study phase (standardized by Berkeley Lab)IA Pending
Study phase (as the queue printed it)Study Phase: GIA In Process; Post GIA Status: Not Started
Queue date2021-12-21
Interconnection agreement date2025-12-09

Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.

Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.