Substation Scout

Acadia Parish, LA interconnection queue

6 active projects totaling 689 MW in the MISO queue, plus 13 with terminal status (shown grayed).

6active projects
689active MW
19total filed
Queue IDProjectkVMWResourceStatus
J3513 Not reported 500 550 Solar Withdrawn
J1462 Not reported 138 150 Solar Withdrawn
J1794 Not reported 138 150 Solar Active
J2249 Not reported n/r 144 Solar Active
J2568 Not reported 138 120 Battery Withdrawn
J2715 Not reported 138 120 Solar Active
J2858 Not reported 138 110 Solar Withdrawn
J566 Not reported n/r 101.9 Solar Withdrawn
J1795 Not reported 138 100 Solar Active
J1904 Not reported 138 100 Solar Active
J2616 Not reported 138 100 Hybrid Withdrawn
J675 Not reported n/r 100 Solar Withdrawn
J1561 Not reported 138 75 Solar Active
J2415 Not reported 138 75 Battery Withdrawn
J3057 Not reported 138 75 Hybrid Withdrawn
J1166 Not reported 138 50 Solar Withdrawn
J700 Not reported n/r 50 Solar Withdrawn
J549 Not reported n/r 49.8 Solar Withdrawn
J550 Not reported n/r 49.8 Solar Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.