Substation Scout

MISO request J2170

MISO queue ID J2170

Queue request J2170 was listed in the MISO interconnection queue at the end of 2025 as a 150 MW battery project in Clark County, IL, according to Berkeley Lab’s queue data file. The filing names Snyder (J1180/J1475 POI) as its point of interconnection. Its status as of December 31, 2025 was “Active”, with a proposed online date of January 1, 2024.

Queue IDJ2170
Project nameNot reported
Status (as published)Active
SubstationSnyder (J1180/J1475 POI)
Point of interconnectionSnyder 345 kV (J1180/J1475 POI)
CountyClark
StateIL
Voltage345 kV
Capacity150 MW
Resource (as published)Battery
Resource categoryBattery (normalized for filtering)
Proposed online date2024-01-01
Source datasetBerkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025

Same substation and county

Clark, IL: 10 requests in the MISO queue, 9 active totaling 1,598.6 MW.

Tracked changes

Not tracked. MISO rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.

Additional filed fields

UtilityAMEREN ILLINOIS
ClusterDPP-2021 Central
Interconnection serviceNRIS
Project typeGeneration
Study phase (standardized by Berkeley Lab)Cluster Study
Study phase (as the queue printed it)Study Phase: DPP 2; Post GIA Status: Not Started
Queue date2022-04-05

Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.

Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first