MISO request J1834

MISO queue ID J1834

Queue request J1834 was listed in the MISO interconnection queue at the end of 2025 as a 126 MW gas project in Orange County, TX, according to Berkeley Lab’s queue data file. The filing names Sabine 138/ Substation as its point of interconnection. Its status as of December 31, 2025 was “Active”, with a proposed online date of May 25, 2025.

Queue IDJ1834
Project nameNot reported
Status (as published)Active
SubstationSabine 138/ Substation
Point of interconnectionSabine 138/230 kV Substation
CountyOrange
StateTX
Voltage230 kV
Capacity126 MW
Resource (as published)Gas
Resource categoryGas (normalized for filtering)
Proposed online date2025-05-25
Source datasetBerkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025

Same substation and county

Orange, TX: 6 requests in the MISO queue, 3 active totaling 1,592 MW.

Tracked changes

Not tracked. MISO rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.

Additional filed fields

UtilityENTERGY TEXAS, INC.
ClusterDPP-2020 South
Interconnection serviceNRIS
Project typeGeneration
Study phase (standardized by Berkeley Lab)IA Pending
Study phase (as the queue printed it)Study Phase: GIA In Process; Post GIA Status: Not Started
Queue date2021-12-16
Interconnection agreement date2024-02-21

Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.

Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.