Substation Scout

Orange, TX interconnection queue

3 active projects totaling 1,592 MW in the MISO queue, plus 3 with terminal status (shown grayed).

3active projects
1,592active MW
6total filed
Queue IDProjectkVMWResourceStatus
R1003 Replace 1163.3 MW of Sabine Units 3, 4 & 1 with 2 on 1 Combined Cycle Gas Turbine facility; Sabine 1 230 1,166 Hybrid Active
J2953 Not reported 230 400 Hybrid Withdrawn
J3045 Not reported 230 300 Solar Active
J3123 Not reported 230 150 Battery Withdrawn
J1834 Not reported 230 126 Gas Active
J502 Not reported 230 100 Solar Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.