Substation Scout

MISO request J1833

MISO queue ID J1833

Queue request J1833 was listed in the MISO interconnection queue at the end of 2025 as a 115.1 MW gas project in Lafourche Parish, LA, according to Berkeley Lab’s queue data file. The filing names Leeville as its point of interconnection. Its status as of December 31, 2025 was “Active”, with a proposed online date of October 1, 2025.

Queue IDJ1833
Project nameNot reported
Status (as published)Active
SubstationLeeville
Point of interconnectionLeeville 115kV
CountyLafourche Parish
StateLA
Voltage115 kV
Capacity115.1 MW
Resource (as published)Gas
Resource categoryGas (normalized for filtering)
Proposed online date2025-10-01
Source datasetBerkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025

Same substation and county

Lafourche Parish, LA: 4 requests in the MISO queue, 1 active totaling 115.1 MW.

Tracked changes

Not tracked. MISO rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.

Additional filed fields

UtilityENTERGY LOUISIANA
ClusterDPP-2020 South
Interconnection serviceERIS
Project typeGeneration
Study phase (standardized by Berkeley Lab)IA Executed
Study phase (as the queue printed it)Study Phase: GIA In Process; Post GIA Status: Not Started
Queue date2021-10-19
Interconnection agreement date2023-01-18

Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.

Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first