Substation Scout

Lafourche Parish, LA interconnection queue

1 active project totaling 115.1 MW in the MISO queue, plus 3 with terminal status (shown grayed).

1active projects
115.1active MW
4total filed
Queue IDProjectkVMWResourceStatus
J2035 Not reported n/r 200 Solar Withdrawn
J2357 Not reported 230 200 Battery Withdrawn
J2570 Not reported 230 200 Battery Withdrawn
J1833 Not reported 115 115.1 Gas Active

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first