Substation Scout

MISO request J171

MISO queue ID J171

Queue request J171 was listed in the MISO interconnection queue at the end of 2025 as a 7 MW project in Swift County, MN, according to Berkeley Lab’s queue data file. The filing names Benson Substation as its point of interconnection. Its status as of December 31, 2025 was “Operational”, with a proposed online date of April 1, 2010.

Queue IDJ171
Project nameNot reported
Status (as published)Operational
SubstationBenson Substation
Point of interconnectionBenson 115kV Substation
CountySwift
StateMN
Voltage115 kV
Capacity7 MW
Resource (as published)Other
Resource categoryOther (normalized for filtering)
Proposed online date2010-04-01
Source datasetBerkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025

Same substation and county

Swift, MN: 7 requests in the MISO queue, 3 active totaling 362 MW.

Tracked changes

Not tracked. MISO rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.

Additional filed fields

ClusterDPP-2012-AUG West
Project typeGeneration
Study phase (standardized by Berkeley Lab)IA Executed
Study phase (as the queue printed it)DPP - SIS
Queue date2010-10-12
Interconnection agreement date2015-05-27
Operational date2010-04-01

Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.

Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.