Swift, MN interconnection queue

3 active projects totaling 362 MW in the MISO queue, plus 4 with terminal status (shown grayed).

3active projects
362active MW
7total filed
Queue IDProjectkVMWResourceStatus
J3886 Not reported 345 300 Wind Active
J3278 Not reported 115 90 Solar Withdrawn
G932 Not reported 69 56 Wind Withdrawn
G034 Not reported 115 55 Other Operational
G782 Not reported 115 42 Wind Withdrawn
G636 Not reported 69 18.9 Wind Withdrawn
J171 Not reported 115 7 Other Operational

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.