MISO request J1599
MISO queue ID J1599
Queue request J1599 was listed in the MISO interconnection queue at the end of 2025 as a 100 MW hybrid project in Iberia Parish, LA, according to Berkeley Lab’s queue data file. The filing names Morbihan - Hopkins as its point of interconnection. Its status as of December 31, 2025 was “Active”, with a proposed online date of September 1, 2025.
| Queue ID | J1599 |
|---|---|
| Project name | Not reported |
| Status (as published) | Active |
| Substation | Morbihan - Hopkins |
| Point of interconnection | Morbihan - Hopkins 138kV |
| County | Iberia Parish |
| State | LA |
| Voltage | 138 kV |
| Capacity | 100 MW |
| Resource (as published) | Solar+Battery |
| Resource category | Hybrid (normalized for filtering) |
| Proposed online date | 2025-09-01 |
| Source dataset | Berkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025 |
Same substation and county
Iberia Parish, LA: 4 requests in the MISO queue, 2 active totaling 220 MW.
Tracked changes
Not tracked. MISO rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.
Additional filed fields
| Utility | CLECO POWER |
|---|---|
| Cluster | DPP-2020 South |
| Interconnection service | NRIS |
| Project type | Generation |
| Study phase (standardized by Berkeley Lab) | IA Pending |
| Study phase (as the queue printed it) | Study Phase: GIA In Process; Post GIA Status: Not Started |
| Queue date | 2020-06-23 |
| Components (hybrid) | Solar 100 MW + Battery |
Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.
Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.