Iberia Parish, LA interconnection queue

2 active projects totaling 220 MW in the MISO queue, plus 2 with terminal status (shown grayed).

2active projects
220active MW
4total filed
Queue IDProjectkVMWResourceStatus
J1560 Not reported 138 200 Solar Withdrawn
J3930 Not reported n/r 120 Battery Active
J1599 Not reported 138 100 Hybrid Active
J694 Not reported n/r 14.7 Solar Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.