MISO request J1530

MISO queue ID J1530

Queue request J1530 was listed in the MISO interconnection queue at the end of 2025 as a 50 MW solar project in Mills County, IA, according to Berkeley Lab’s queue data file. The filing names Tap Hastings - Macedonia line at about midpoint as its point of interconnection. Its status as of December 31, 2025 was “Active”, with a proposed online date of March 1, 2026.

Queue IDJ1530
Project nameNot reported
Status (as published)Active
SubstationTap Hastings - Macedonia line at about midpoint
Point of interconnectionTap Hastings (635033) - Macedonia (635069) 69 kV line at about midpoint
CountyMills
StateIA
Voltage69 kV
Capacity50 MW
Resource (as published)Solar
Resource categorySolar (normalized for filtering)
Proposed online date2026-03-01
Source datasetBerkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025

Same substation and county

Mills, IA: 5 requests in the MISO queue, 1 active totaling 50 MW.

Tracked changes

Not tracked. MISO rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.

Additional filed fields

UtilityMIDAMERICAN ENERGY CO.
ClusterDPP-2020 West
Interconnection serviceNRIS
Project typeGeneration
Study phase (standardized by Berkeley Lab)IA Pending
Study phase (as the queue printed it)Study Phase: GIA In Process; Post GIA Status: Not Started
Queue date2021-04-16
Interconnection agreement date2024-08-05

Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.

Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.