Mills, IA interconnection queue
1 active project totaling 50 MW in the MISO queue, plus 4 with terminal status (shown grayed).
1active projects
50active MW
5total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| J3737 | Not reported | n/r | 100 | Battery | Withdrawn |
| J3149 | Not reported | n/r | 80 | Solar | Withdrawn |
| J1530 | Not reported | 69 | 50 | Solar | Active |
| J3212 | Not reported | n/r | 50 | Solar | Withdrawn |
| J1344 | Not reported | 69 | 48 | Solar | Withdrawn |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.
Site Scanner