MISO request J1481
MISO queue ID J1481
Queue request J1481 was listed in the MISO interconnection queue at the end of 2025 as a 200 MW solar project in Howard County, IN, according to Berkeley Lab’s queue data file. The filing names Greentown substation as its point of interconnection. Its status as of December 31, 2025 was “Active”, with a proposed online date of August 15, 2025.
| Queue ID | J1481 |
|---|---|
| Project name | Not reported |
| Status (as published) | Active |
| Substation | Greentown substation |
| Point of interconnection | Greentown 230 kV substation |
| County | Howard |
| State | IN |
| Voltage | 230 kV |
| Capacity | 200 MW |
| Resource (as published) | Solar |
| Resource category | Solar (normalized for filtering) |
| Proposed online date | 2025-08-15 |
| Source dataset | Berkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025 |
Same substation and county
Greentown substation substation: 2 requests in the MISO queue, 2 active totaling 400 MW.
| Queue ID | Project | MW | Resource | Status |
|---|---|---|---|---|
| J1381 | Not reported | 200 | Solar | Active |
Howard, IN: 5 requests in the MISO queue, 2 active totaling 400 MW.
Tracked changes
Not tracked. MISO rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.
Additional filed fields
| Utility | DUKE ENERGY INDIANA |
|---|---|
| Cluster | DPP-2019 Central |
| Interconnection service | NRIS |
| Project type | Generation |
| Study phase (standardized by Berkeley Lab) | IA Executed |
| Study phase (as the queue printed it) | Study Phase: GIA; Post GIA Status: Not Started |
| Queue date | 2019-04-29 |
| Interconnection agreement date | 2025-09-09 |
Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.
Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.