Substation Scout

Howard, IN interconnection queue

2 active projects totaling 400 MW in the MISO queue, plus 3 with terminal status (shown grayed).

2active projects
400active MW
5total filed
Queue IDProjectkVMWResourceStatus
J1381 Not reported 230 200 Solar Active
J1481 Not reported 230 200 Solar Active
J2766 Not reported n/r 190 Battery Withdrawn
J076 Not reported 138 151.2 Wind Withdrawn
J2236 Not reported 230 100 Battery Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first