MISO request J1390

MISO queue ID J1390

Queue request J1390 was listed in the MISO interconnection queue at the end of 2025 as a 150 MW solar project in Bartholomew County, IN, according to Berkeley Lab’s queue data file. The filing names Gallagher Station - Columbus Line Tap as its point of interconnection. Its status as of December 31, 2025 was “Active”, with a proposed online date of August 1, 2025.

Queue IDJ1390
Project nameNot reported
Status (as published)Active
SubstationGallagher Station - Columbus Line Tap
Point of interconnectionGallagher Station - Columbus 230 kV Line Tap
CountyBartholomew
StateIN
Voltage230 kV
Capacity150 MW
Resource (as published)Solar
Resource categorySolar (normalized for filtering)
Proposed online date2025-08-01
Source datasetBerkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025

Same substation and county

Bartholomew, IN: 5 requests in the MISO queue, 1 active totaling 150 MW.

Tracked changes

Not tracked. MISO rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.

Additional filed fields

UtilityDUKE ENERGY INDIANA
ClusterDPP-2019 Central
Interconnection serviceNRIS
Project typeGeneration
Study phase (standardized by Berkeley Lab)Construction
Study phase (as the queue printed it)Study Phase: GIA; Post GIA Status: Under Construction
Queue date2019-04-29

Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.

Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.