MISO request J1314

MISO queue ID J1314

Queue request J1314 was listed in the MISO interconnection queue at the end of 2025 as a 100 MW solar project in Polk County, WI, according to Berkeley Lab’s queue data file. The filing names Apple River Substation as its point of interconnection. Its status as of December 31, 2025 was “Active”, with a proposed online date of June 30, 2025.

Queue IDJ1314
Project nameNot reported
Status (as published)Active
SubstationApple River Substation
Point of interconnectionApple River 161 kV Substation
CountyPolk
StateWI
Voltage161 kV
Capacity100 MW
Resource (as published)Solar
Resource categorySolar (normalized for filtering)
Proposed online date2025-06-30
Source datasetBerkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025

Same substation and county

Polk, WI: 3 requests in the MISO queue, 2 active totaling 200 MW.

Tracked changes

Not tracked. MISO rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.

Additional filed fields

UtilityDAIRYLAND POWER COOPERATIVE
ClusterDPP-2019 West
Interconnection serviceNRIS
Project typeGeneration
Study phase (standardized by Berkeley Lab)Construction
Study phase (as the queue printed it)Study Phase: GIA In Process; Post GIA Status: Under Construction
Queue date2019-04-29
Interconnection agreement date2022-08-26

Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.

Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.